Monday, 30 July 2012

Buildings or structures - the Woolley Chickens case


One of the perennial problems for planning lawyers is whether objects placed on land which are allegedly ‘portable’ or ‘moveable’ or ‘temporary’ are in truth buildings or structures, so that their installation, assembly or erection on the site comes within the definition of development in section 55 of the 1990 Act, thus requiring planning permission under section 57.

We have been accustomed for many years to refer to the test originally set out in Cardiff Rating Authority v. Guest Keen Baldwin [1949] 1 KB 385 as refined by later decisions such as Skerritts of Nottingham Limited v SSETR [2000] 2 P.L.R. 102, and we now have a further case which provides additional clarification of this issue. This is the ‘Woolley Chickens’ case – R (Save Woolley Valley Action Group Ltd) v Bath and North East Somerset Council [2012] EWHC 2161 (Admin), in which judgment was given in the High Court last Friday (27 July).

This was a challenge to a decision by the Council that ‘chicken sheds’ (or ‘mobile poultry units’) in the Woolley Valley were not development. The Claimant contended that the poultry units were “development” within the meaning of section 55, and further that they required EIA, pursuant to the EIA Regulations and the EIA Directive. The Secretary of State supported the Claimant’s position on both these points.

The poultry units were each intended to house 1,000 laying hens (although in practice they accommodate ducks); each unit is approximately 20 metres by 6 metres by 3.5 metres high; the units are not fixed to the ground but are on metal skids to allow them to slide along the ground when pulled by a tractor; if extreme winds are forecast, they can be held down with metal spikes; each unit weighs about 2 tonnes (in addition to the 2 tonne flock of birds which each unit houses); each unit is located in a fenced paddock of 1-2 acres and stays in its paddock; the intention was that the units would be moved within their paddocks regularly (approximately every 8 weeks) by being dragged by a tractor or 4 x 4. Each unit can be assembled by a ‘skilled team’ from metal hoops, metal skids, uPVC planks, polythene and insulation in ‘a couple of days’. If the metal hoops are not taken apart, a shed can be dismantled in 3-4 hours. The units contain slatted floors, manually operated conveyor belts, drinkers, feeders and internal lighting. They are powered by an on-site external generator. The units are supplied with mains water by means of a hosepipe connection to standpipes, which are located along the side of the access track.

The units have not, in fact, been moved in the way that was originally envisaged. There was evidence before the court that none of the units has been moved since being placed in position between April and October 2010. There had been some attempts to move the units within the paddocks but the towing support bars supplied by the manufacturer failed.

The Council decided that the placing of the poultry units on the land did not constitute development. The Council therefore concluded that no EIA of that activity was required and no enforcement action could be taken. The Council’s planning judgment was based on their size, permanence and physical attachment to the ground, as a matter of fact and degree. The Council considered that factors weighing against the sheds being buildings were their lack of attachment to the ground and ability to be moved around the site. However weighing in favour of them being buildings were their sheer size, weight and bulk. The developer had produced a planning appeal decision dating from December 2009 against the refusal of a Lawful Development Certificate, in which it had been concluded that a mobile poultry unit measuring 9.5m x 5.5m x 3.2m high did not constitute a building for the purposes of section 55 of the Act. In that case, only one unit had been proposed. It housed 465 laying hens, was delivered as a flat pack and assembled on site by two unqualified people in two days. It was not anchored to the ground, nor did it require a hard standing, and it could be moved by a tractor and was expected to be moved every 15 months. [This commentator feels bound to observe that, in view of this last fact, that earlier appeal decision was arguably wrong in law, even at that time - see Skerritts.]

In the present case, the 10 units would be larger and heavier, but were intended to be moved more frequently and assembled on site in the same way as in the cited appeal case. The Council also noted that the dimensions of each unit were almost the same as the dimensions of a twin-unit caravan as defined in section 13 of the Caravan Sites Act 1968 (which are: 20 metres long, 6.8 metres wide and 3.05 metres high). On the basis of the information supplied and as a matter of fact and degree, the Council’s officers considered that the mobile poultry units would appear to be ‘chattels’ capable of being moved around the site by a 4x4 vehicle. Furthermore, once assembled they could be dismantled and loaded onto a flat bed lorry in a matter of hours and transported to other sites. On this basis the Council’s officers concluded that these units did not constitute development.

The Council submitted that it had correctly applied the test in Skerritts in deciding whether or not the poultry units were ‘buildings’, which in turn referred back to the test in the Cardiff Rating case. The Council had assessed the evidence, and acknowledged that the “sheer size, weight and bulk” of the units pointed towards a finding that they were ‘buildings’. However, these factors (the Council said) were outweighed by the fact that the units were not attached to the ground, and were mobile. The Council claimed that, on the evidence, it was entitled to conclude that the units were impermanent and were chattels, not buildings.

However Mrs Justice Lang held that the Council erred in law in taking too narrow an approach to the meaning of “development” in section 55. The term “building” in section 336(1) of the 1990 Act has a wide definition which includes “any structure or erection”. This definition has been interpreted by the courts to include structures which would not ordinarily be described as buildings. In Skerritts, an Inspector held that the erection of a 40 metre by 17 metre by 5 metre high marquee for an eight month period was the erection of a building. In Hall Hunter v First Secretary of State [2007] 2 P. & C.R. 5 the erection of polytunnels was also the erection of a building. Both decisions were upheld by the Courts.

In the light of these authorities, the Council should have carefully considered whether a poultry unit was an “erection” or “structure” within the meaning of section 336(1), particularly bearing in mind the substantial size and weight of each unit. Furthermore, the Council did not have regard to the relevant authorities when it concluded that the units were chattels, not buildings, by reason of the fact that they were capable of being moved around the site. In Barvis Ltd v Secretary of State for the Environment (1971) 22 P & CR 710, a tower crane on a steel track was held to be a “structure” or “erection” and thus a “building”, even though it was moved around the site and, at the end of the contract, it would be dismantled and removed to another site. Moreover, an object may be a building in planning law without being incorporated into the land, as part of the realty (see R v Swansea City Council ex p Elitestone (1993) 66 P. & C.R. 422. )

Moreover, the Council did not direct itself correctly in law on the issue of permanence. Permanence has to be construed in terms of significance in the planning context. In Skerritts Schiemann LJ said of permanence: “in situ for how long, to which I would answer: for a sufficient length of time to be of significance in the planning context”. For the polytunnels in Hall Hunter to remain in one particular location for three months was found by the Inspector to be sufficient to be of consequence in the planning context. In this case, the units were permanently in their field, and there was no limit on the length of time they would remain there – they could be there for years. The ability to move them around the field did not remove the significance of their presence in planning terms. The visual and landscape impact of the units was not affected to any material extent by any periodic changes to their position in the field. [N.B. This is an important change compared with the previous understanding as to periodic movement of items within a site.]

The Council submitted that each unit was prefabricated and easily assembled, so its construction was not an operation “normally undertaken by a person carrying on business as a builder” (section 55(1A)(d)). They had argued that it followed that constructing the units was not a “building operation” within the meaning of section 55. However, in Her Ladyship’s judgment, section 55(1A) is inclusive; it is not intended to be an exhaustive definition of “building operations”. In any event, she accepted the submission made on behalf of the Secretary of State that the works carried out to construct and install the units were capable of coming within section 55(1A)(d). The Council had failed to consider the application of that paragraph of the sub-section.

The Secretary of State also submitted that the Council erred in failing to consider whether the construction of the poultry units came within the residual category in section 55(1), namely, “other operations in, on, over or under land”. This residual category is not limited to building, engineering or mining operations: see Coleshill and District Investment Co Ltd v. Minister of Housing and Local Government [1969] 1 WLR 746 and Beronstone Ltd v. First Secretary of State [2006] EWHC 2391 (Admin). (In light of these judgments, the view of Jack J. in Tewksbury Borough Council v Keeley [2004] EWHC 2954, which appears to decide to the contrary, cannot be relied upon.). The Court agreed that this term is sufficiently broad to encompass the construction / installation of the poultry units, if they do not fall within the meaning of “building operations”, and therefore the Council should have gone on to consider this question.

The Council was therefore held to have misdirected itself in law in its application of section 55 of the 1990 Act to the poultry units.

I confess that I have always had difficulty with the concept of “other operations”, not least because of the decision of the House of Lords in Coleshill that the term is not to be construed ejusdem generis with the other items in the list - “building”, “engineering” and “mining”. This latest judgment could have wide implications in bringing within the definition of ‘development’ a number of operations which might not previously have been thought to be development.

As I observed in passing, this judgment also appears to bring within the scope of ‘development’ a number of portable, mobile or temporary items that are moved about a site from time to time, and which had previously been thought successfully to escape the definition of development by virtue of that device. This is a case which appears to me to sweep into the net a wider category of ‘non-structures’ (which must now be regarded as buildings or structures) than had previously been understood to come within that category.

There must inevitably be the possibility that the developer may seek to appeal to the Court of Appeal. However, on a first reading, I found Mrs Justice Lang’s reasoning compelling. This judgment could prove to be a new benchmark for determining the issue of whether operations of this type come within the definition of development under section 55.

I am grateful to counsel for drawing my attention to this judgment.

© MARTIN H GOODALL

30 comments:

Anonymous said...

Hi,

How does this decision impact on residential properties using 'temporary stuctures'for residential purposes?

Such as a box trailer permanently parked and attached through the tow hitch to the building, and then used to garage a vehicle.
Does the trailer then effectively become a garage/structure in planning terms and subject to enforcement for unlawful use and/or unlawful development?

Or is this already catered for in the planning legislation and case law?

Thoughts please?

Martin H Goodall LARTPI said...

I advised a client earlier this year regarding this issue, which (as has been suggested above) may well be affected by the ‘Woolley Chickens’ case – although it would not affect the particular case on which I advised my client. This is not a straightforward point, and I was obliged to charge £600 plus VAT for my legal advice. In fairness to that client, I could not now broadcast that advice to the world free of charge, and so if my anonymous correspondent requires an answer to this query, he should please email me to arrange to deposit the necessary sum on account of costs (£600 plus VAT = £720). This is remarkably cheap, as I usually reckon to charge not less than £1,500 plus VAT for written legal advice nowadays.

Lionel C Smith said...

Dear Martin
Does this decision not lead to more confusion? The phrases degree of permanence, matter of fact and degree are beyond interpretation. No ordinary person could be expected to work within such phrases and thus the law seems unintelligible.
Do hen houses at 4.8m x 2.4m housing 100 birds, moved every few weeks fall as a permanent structure?
Regards
Lionel

Martin H Goodall LARTPI said...

The implications of the judgment could potentially be quite far reaching. The answer to Lionel Smiths’s question is – “Yes, quite possibly” (although the precise answer would depend on a more detailed assessment of the circumstances). Inevitably every single case is going to be judged individually as ‘a matter of fact and degree’. Arguably, the ‘Woolley Chickens’ case could have been decided on the existing law (Cardiff Rating, plus Skerritts) without the need for the additional judicial observations in this case, which appear to have widen the judicial definition of a building or structure.

Lionel C Smith said...

Thank you for your answer Martin. This is a somewhat worrying development because if every single case falls to somebody elses opinion, then how do we know wrong from right? The financial implications alone would be of concern let alone the time delays caused by planning authorities.

It feels from your answer that we could face the prospect of having to judge whether every structure upon the farm is either a chattel or structure. After that decision is made, if it is considered a structure, then we are faced with having to find out is it a structure requiring planning permission or is it a structure that is considered moveable that does not need permisions?

If I have the above analogy correct (and I do not profess to know whether I do or don't) then surely this is not the way to live and work?
Kind regards
Lionel

Martin H Goodall LARTPI said...

This will not be such a problem for farmers as it may be for people involved in other, non-agricultural, activities (such as the keeping of horses). Provided an agricultural building or structure meets the relevant criteria, it may well be permitted development under Part 6 of the Second Schedule to the General Permitted Development Order. This is, of course, subject the requisite prior notification having been given to the local planning authority, who may wish to approve details of the siting and design of the building or structure in question. However, failure to give prior notification as required by Part 6 would take the development wholly outside the scope of permitted development within Part 6, and retrospective permission could then be given only by way of a full planning permission (if granted).

The other point to bear in mind is that if ‘mobile’, ‘portable’ or ‘temporary’ items do prove to be buildings or structures and, for one reason or another, are not permitted development under Part 6, it will simply be necessary to make a planning application, which is not a particularly onerous task.

Evan Owen - Snowdonia said...

This is certainly "woolley", Just think of all the planning applications that will have to be made to retain cattle feeders, shipping containers, caravans, pig arks, 'mobile' field shelters... or is it all a matter of 'fact and degree' as to how big the item needs to be?

Martin H Goodall LARTPI said...

Evan is absolutely right. The implications of this judgment are rather worrying. It is indeed going to be ‘a matter of fact and degree’ in every case, but quite a few of the items Evan lists could be caught in future. However, if genuinely needed for agriculture on an existing agricultural unit, many of these things could be permitted development under Part 6. The real problems would arise on other sites where this development doesn’t qualify as PD under Part 6.

Anonymous said...

Hi Martin,

Sorry to bring up this one - but in the case of static caravans? I have one in my garden, 3m tall, within 2m of the boundary. Local planning says it has to go, or I must apply for planning permission. Surely the Measor Principle still stands in that the council cannot define a static caravan as a structure for the purposes of the 1990 act or the later GPDO legislation?

Thanks

Martin H Goodall LARTPI said...

In light of the decision in the ‘Woolley Chickens’ case, there must be considerable doubt as to the continued application of the principle that was demonstrated by Measor in 1998. In that case, it was held that caravans lack the degree of permanence and attachment to constitute buildings. Even as early as 2000, the Skerritts of Nottingham case demonstrated that ‘permanence’ could be established by the presence of the object in question for only a few months. The fact that the object (such as a caravan) is theoretically capable of being moved will not prevent its being regarded as a structure, if in practice it remains in one position for a significant length of time (i.e. for more than a few months). The ‘Woolley Chickens’ case seems to go even further than this, and suggests that even moving the object about the site from time to time may not save it from being classed as a structure.

englishrat said...

Perhaps since the Dale farm debacle anybody using caravans has been prejudiced by this judgment, particularly the smallholder. This judgment is unlikely to impact the thousands of dishevelled sheds on allotments, or the large scale intensive farmer. However as a smallholder we have been using the odd caravan for the past 4 years and go to appeal annually to justify each caravan when it arrives (the enforcement notice usually follows within weeks).

gill said...

Hi Martin
I would like your opinion on the following please. Would you consider that a 2 bay stable block was a temporary structure or would it fall under the definition of "development" ? It was brought onto the field immediately next to our house (within 15 metres of our bedrooms) in November 2012 and erected on site by 2 men over 3 days. The land upon which it sits had to be levelled and compacted. It now forms one side of a stable yard facing us. The other 4 bay stable did not have permission, but after 2 years of dithering, the Council finally decided it was not expedient to take enforcment. The 2 bay stables has never moved an inch since it was built. Last month mains electricity was connected to it from the existing 4 bay stables. I sent the Wolley Chickens judgement to the PEO. Her response was that the sheds in that were bigger than the stable block (?) and that there were lots of them, in contrast to this situation. She also said that even if the building was considered to be development (which she maintains it is NOT) it does not need PP because it causes no harm. It actually causes significant problems for us in terms of smell, flies, noise and disturbance, pollution (the waste is swept out onto the yard which drains down onto us and lies immediately next to us). I have asked for the enforcement assessment which has decided there is "no harm" caused by the additional permanent stabling but she says this is not required, her opinion is final. Surely, the issue here is that it is development and as such must be fully assessed ? Oh, and this is all in an AONB ! the impact on us is that the stench, flies, fumes from Farrier, constant noise (7-7 every day including Xmas day !) has removed quiet enjoyment of our home, removed all privacy and caused us to fear fire and disease. HELP !

Martin H Goodall LARTPI said...

In answer to Gill (18/02/14), I would say that the stable is a building or structure within the meaning of section 55 and section 336(1), for the reasons rehearsed in this blog post (including the “Woolley chickens” case) and so it requires planning permission. However, a decision by the council as to whether or not to take enforcement action is a matter of discretion, and they will not do so if they consider that it is not ‘expedient’* to serve an enforcement notice (* the word used in section 172).

If no enforcement notice is served, the operational development will become immune from enforcement 4 years after it was substantially completed, but any change of use of the land (e.g. from agriculture to an equestrian use – “horsiculture”) will become immune from enforcement only after 10 years of continuous use for that purpose following the change of use.

As explained elsewhere in this blog, when operational development becomes immune from enforcement under the 4-year rule, the use of the building and of the land on which it stands does not thereby become lawful, and will still be governed by the 10-year rule. This is a further issue which the council ought perhaps to consider, particularly bearing in mind the nuisance that this use clearly causes.

If the enforcement officer still refuses to take the matter seriously, I suggest you contact a local councillor and press them to ensure that effective action is taken to tackle the problem.

gill said...

Hi Martin
Many thanks for your advice and for your time. Can I ask you just one more question (well in 2 bits !) 1.a - does there not have to be an expediency assessment ? and 1b - in deciding on expediency does the PEO not have to have regard to material planning considerations - noise, nuisance, disturbance, loss of privacy, fear of crime ?
I am most grateful for your advice.
Gill

Martin H Goodall LARTPI said...

In answer to Gill’s further query, the LPA must consider whether it is expedient to serve an enforcement notice under section 172, but this does not involve any formal assessment; it is simply a matter of professional judgement. The matters that Gill refers to are all material considerations that the enforcement officer should take into account, but in practice it is very difficult to prove that they have not been considered. Judicially reviewing a decision not to take enforcement action is well nigh impossible – I can only think of one example of a mandatory order made by the High Court requiring the service of an enforcement notice; there may have been one or two others, but they really are extremely rare. Political pressure (via elected members) may be the only practicable chance of securing enforcement action in such cases, if at all.

Anonymous said...

How does the "Woolley Chicken" case sit with R v Schonewille 2010, in which the Court of Appeal in 2011 held that a caravan incorporated into a large former workshop and used for residential purposes was still a caravan. The caravan was removed of mobility, remedial work had been done to a damaged floor, a replacement floor was fitted, the floor was structurally supported by wooden pillars concreted into the ground. In addition the rear wall of the building had been removed and later replaced once the caravan was inside, internal walls were created within the building structurally supported by both the caravan and the building, attachment to both was facilitated.

Michael Sterne said...

Eastleigh and Fareham Borough Councils, which border the River Hamble, require planning permission to place floating pontoons between piles in the river. The pontoons are fixed to the piles and are easily moveable. Is it lawful for the councils to require planning permission?

Martin H Goodall LARTPI said...

Providing moorings or forming a marina on any estuary, river or canal, may be a material change of use of the land covered by that water, but the provision of any permanent fixtures or fittings, such as mooring blocks either on the bank or on the river bed and the provision of jetties, pontoons, boardwalks and other facilities, will almost certainly be engineering operations that will require planning permission.

Michael Sterne said...

Thank you for that comment for which I am very grateful. However, I am afraid I have not explained clearly enough. The mooring piles in the river are already used for mooring pairs of boats. The effect of placing a floating pontoon between them, which as I say is completely removable, is to move the boat one metre further apart. Is this a material change of use? I should be very grateful, additionally, if you could consider this.

Martin H Goodall LARTPI said...

As I pointed out in my previous comment, the provision of pontoons, boardwalks, etc. is likely to be seen as an engineering operation. Whether a change of use is also involved will depend on whether the provision of the pontoon leads to such an intensification of use of the moorings as to change the character and impact of the use to such an extent as to be material in planning terms. This is bound to be a matter of fact and degree and may only become apparent over a period of time.

Martin H Goodall LARTPI said...

With regard to the comment of 02/07/14, I do not consider that R v. Schonewille has any bearing on the Woolley Chickens case. In Schonewille the question before the court was whether or not there had been compliance with an enforcement notice that required “removal of the caravan from the land”. In purported compliance with the notice, the appellant had moved the caravan and installed it inside a building on the site. In his defence it was argued that it had thereby ceased to be a caravan and had become part of the building. This argument was rejected; the caravan had not been removed from the land and the conviction was upheld.

At no point does it appear to have been argued on either side that the caravan in its original location was a building or structure, by reason of its permanence on the site. (This is the essential point established by the Woolley Chickens case.) It appears that in Schonewille the LPA proceeded on the basis that the stationing of the caravan was a change of use of the land, and the dispute focussed on whether the steps required to be taken in order to comply with the notice had in fact been taken.

Anonymous said...

Am I misinformed?
s55(2)states that agriculture is not to be taken as development of land, and so s57 says planning permission is not required. s336 gives the definition of agriculture which seems to include poultry. So why did they need planning permission?

My circumstances are that I wish to erect an open-sided field shelter for a horse (been there 20 years). I see that s366 includes grazing land as agricultural and so feel that s55(2)(e)means that a reasonable structure would not be development and so exempt from planning permission.

Have I lost the plot?

Martin H Goodall LARTPI said...

Section 55(2) relates to changes of the use of land (including any existing buildings; it does not allow new buildings to be erected. Certain buildings for agricultural purposes may be erected as permitted development under Part 6 of the Second Schedule to the GPDO, but only on larger agricultural units (5 hectares or more) and subject to a prior notification procedure. The poultry farmer in the Woolley Chickens case thought the ‘mobile’ poultry houses were not buildings or structures, so did not use the prior notification procedure under Part 6.

Keeping of horses (as opposed to their simply being grazed on the land is not an agricultural use, so PD rights under Part 6 would not arise in that case. If the alleged use is for grazing, the whole planning unit (which would have to be 5 hectares or more in size)would genuinely have to be in agricultural use for any PD rights under Part 6 to arise.

Anonymous said...

Further to my previous post (30/9/14}
Town and Country Planning Act 1990
Section 55(2) states:
(2)The following operations or uses of land shall not be taken for the purposes of this Act to involve development of the land—
(e)the use of any land for the purposes of agriculture or forestry (including afforestation) and the use for any of those purposes of any building occupied together with land so used;
Section 336 includes “grazing animals” as agriculture. I fail to see any differentiation between recreational and commercial intentions.
I fully accept that is not a loop hole to develop an equestrian centre. PD is not available to me as without renting further land I do not have the 5ha requirement nor is this a business use in any event.
My argument, is that a field shelter (and nothing more elaborate than that) becomes a “building occupied together with the land so used;” for the agricultural use of grazing animals, in this case horses.
In my case, the whole land provides winter hay and grazing on a 3.5 ha site. I accept that a 20 horse stable block requiring significant external food resources is well beyond the grazing of the land.
You refer to keeping of horses being different from grazing of horses, and I believe that such a difference is the difference of a capacity beyond what the land can support naturally as grazing, as illustrated above.
So I come back to the argument that a horse and pony on 3.5ha which essentially supplies all their forage needs with a hay crop, is grazing rather than a more intensive ‘keeping of horses’. Whilst irrelevant to myself, I would argue that the number of horses could be could be as much as the land could take, even with winter feed being imported (but not summer) but not so many so that stabling or other hard standing is required to reduce the damage and impact to the land that would otherwise be unsustainable.
As for s55 referring only to change of use, I quote:
55 Meaning of “development” and “new development”.
(1)Subject to the following provisions of this section, in this Act, except where the context otherwise requires, “development,” means the carrying out of building, engineering, mining or other operations in, on, over or under land, or the making of any material change in the use of any buildings or other land.
I say that the erection of a field shelter is a new development by way of being “the carrying out of building”.
And so s55(2)(e) goes on to give the exemption for planning permission. I can’t see that s55 is exclusive to change of use but quite clearly encompasses “material change of use” as ‘development’ which will therefore require planning permission unless exemptions apply.
Ultimately I feel that the legislation is intended so as not to fetter reasonable use of grazing land but prevent undesirable development, by way of structures or use.
I would appreciate your comments and ultimately do I need permission for a modest field shelter in my circumstances as described?

Martin H Goodall LARTPI said...

The reference in section 55(2)(e) to “the use.....of any building........” refers only to the use of any existing building on the site for that purpose. It does not allow the erection or installation of any building. The erection or installation of a building or structure of any description on agricultural land requires planning permission, either as granted by Article 3 and Part 6 of the Second Schedule to the GPDO (not applicable in this case) or in the form of a planning permission granted by the LPA.

Whether the presence of horses on the land is ‘grazing’ (agriculture) or what is colloquially known as ‘horsiculture’ (the keeping of horses on the land) depends on the purpose for which they are there. If they are let onto the land occasionally solely for the purposes of feeding, i.e. grazing on the grass, then that is an agricultural use. However, if they spend their whole time, or substantial periods of time there, then this is likely to be seen as the keeping of horses on the land (i.e. a non-agricultural use, which therefore amounts to a material change of use). This is ‘a matter of fact and degree’, but the presence of facilities such as a field shelter or loose box, etc. would seem to strengthen the impression that is an is a non-agricultural use. It may be acceptable in a rural area in planning terms, but requires planning permission.

I am afraid that the questioner will not find a single planning professional who would agree with his purported interpretation of section 55.

Anonymous said...

Dear Martin

I am intrigued how the the Woolley Chickens case might impinge on Goverment policy.

Specifically this from the National Planning Policy Framework
"A local planning authority should regard the construction of new buildings as inappropriate in Green Belt. Exceptions to this are: limited infilling or the partial or complete redevelopment of previously developed sites (brownfield land), whether redundant or in continuing use (excluding temporary buildings), which would not have a greater impact on the openness of the Green Belt and the purpose of including land within it than the existing development.

Will the meaning of 'temporary buildings ' now be defined by this case?

A scenario that springs to mind. 10 year plus storage depot using shipping containers bolted to the ground on a brownfield site.

Regards
Peter

Martin H Goodall LARTPI said...

What the ”Woolley Chickens” case does is to clarify further the definition of a building or structure for planning purposes. In other words, does bringing the object in question onto the land constitute a building operation (and therefore development within the definition set out in section 55 of the 1990 Act), or not? If it is not built development, its stationing on the land might still represent a material change of use of the land. The ”Woolley Chickens” case really has no significance beyond this, and certainly not in terms of the operation of planning policy.

Planning policy, both in local planning authorities’ development plans and in the NPPF, is to discourage development in the Green Belt unless it is not ‘inappropriate’ development (see the definition of this in the NPPF) or unless there are very special circumstances which could justify it. This can apply both to operational development (building, engineering, mining or other operations) and to material changes of use.

If operational development has taken place without planning permission, it will (provided it has not been materially concealed to any extent) become immune from enforcement, and therefore lawful, four years after this development was substantially completed. Subject to the same proviso regarding concealed development, a material change of use (other than a change of use to use as a single dwellinghouse) will become immune from enforcement, and therefore lawful, following ten years of continuous and uninterrupted use after the material change of use took place. That, however, does not necessarily provide any sort of lever in terms of gaining planning permission for replacement of the objects or structures on the site (especially if they are in the form of shipping containers), still less can it operate as any sort of justification for the more comprehensive redevelopment of the site.

In view of adopted policies, the scenario that Peter postulates would still be likely to meet with strenuous opposition from the LPA, and is likely to get short shrift from the Planning Inspectorate if a refusal were to be appealed.

Anonymous said...

I am not a planning professional, which will become obvious, but have read this blog with interest. Mrs Justice Lang appears to have defined temporary moveable buildings very narrowly and indeed most structures would be defined as buildings. I assume because the Woolley case had generated so much public interest!
Reading around I found another more recent case John Turner v SSCLG [2015] EWHC 2728, again heard by Mrs Justice Lang. However, in her judgement paragraph 29 she states 'the mobile home which was to be replaced was not a "building"'. Using her definition in the Woolley case the mobile home clearly was a building.
Do you believe that Mrs Justice Lang has overruled herself in this case?

Martin H Goodall LARTPI said...

I am grateful to my anonymous correspondent for drawing attention to this other judgment. I shall have to take a look at it. So watch this space! I'll post a further comment here shortly.

Martin H Goodall LARTPI said...

I have now taken a look at the judgment in Turner (which, incidentally, has recently been upheld by the Court of Appeal). It turns out that the legal status of ‘mobile’ structures did not feature in the judgment at all, and so this judgment has no effect on Lang J’s earlier judgment in the Woolley Chickens case.

What Turner was about was the dismissal of an appeal against the refusal of planning permission for a permanent replacement of various ‘temporary’ structures/objects in the Green Belt. The case turned on the interpretation of polices to protect the openness of the Green Belt, and in particularly paragraph 89 of the NPPF. Unsurprisingly, the Inspector’s decision dismissing the planning appeal on these grounds was upheld, first by Lang J in the High Court, and now also by the Court of Appeal.